<item>
<title><![CDATA[Loughborough Design School  (200) - Water Hygiene Compliance Rectifications - 11th &amp; 12th June 2026.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Minor plumbing alterations at sinks and wash hand basins. &nbsp;</p>
<p>The sink or basin will be offline for 1 to 3 hours at a time while the work is taking place.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>11th &amp; 12th June 2026.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Nikki Kilday &ndash; Water Hygiene</p>
<p>Mobile: &nbsp;07394835656</p>
<p>Email: &nbsp;N.Kilday@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/loughborough-design-school---water-hygiene-compliance---11-12-june-26.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/loughborough-design-school---water-hygiene-compliance---11-12-june-26.html</guid>
<pubDate>Wed, 10 Jun 2026 14:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Loughborough Student Union (380) - LSU Plantroom Refurbishment Project - 22/06/2026-28/08/2026.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Main plantroom heating refurbishment.</p>
<p>Heating plant has reached end of life and is due for replacement, boilers, flu&rsquo;s, pumps and valves will be renewed.</p>
<p>We are carrying the works out during summer, so there will be no impact on staff and students.</p>
<p>Minor disruption to hot water supply on 2 mornings during project, this will be communicated and agreed with LSU staff.</p>
<p>2No. car parking bays will be used to accommodate contractors.</p>
<p>Noise to be expected during works, but less so as work progresses.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>22<sup>nd</sup> June &ndash; 28<sup>th</sup> August 2026.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: David Barsby Projects&nbsp;</p>
<p>Mobile: &nbsp;07056043330</p>
<p>Email: &nbsp;d.r.barsby@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/loughborough-student-union---plantroom-refurbishment---22626-28826.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/loughborough-student-union---plantroom-refurbishment---22626-28826.html</guid>
<pubDate>Wed, 10 Jun 2026 14:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Multiple Buildings - Fire Door Inspection - 15/6/26 to 30/8/26.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>The work needs to be done to ensure fire safety compliance within University buildings.</p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases.&nbsp; The disruption is expected to be minimal.&nbsp; The Contractor has been asked to report to Receptions where applicable, prior to carrying out the inspections in each building.</p>
<p>(079) &ndash; Michael Pearson West</p>
<p>(006) &ndash; James France</p>
<p>(004) &ndash; Martin Hall</p>
<p>(010) &ndash; EHB</p>
<p>(005) &ndash; Schofield</p>
<p>(007) &ndash; Brockington</p>
<p>(029) &ndash; Brockington Extension</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>From 15/6/26 to 30/8/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p>Mobile:&nbsp; 07729080155</p>
<p>Email:&nbsp; R.M.Harrison@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/multiple-buildings---fire-door-inspection---15626-to-30826.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/multiple-buildings---fire-door-inspection---15626-to-30826.html</guid>
<pubDate>Wed, 10 Jun 2026 14:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Clyde Williams (080) - Water Hygiene Compliance Rectifications - 10th - 12th June 2026.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Minor plumbing alterations at sinks and wash hand basins. &nbsp;</p>
<p>The sink or basin will be offline for 1 to 3 hours at a time while the work is taking place.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>10th - 12th June 2026.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Nikki Kilday &ndash; Water Hygiene</p>
<p>Mobile: &nbsp;07394835656</p>
<p>Email: &nbsp;N.Kilday@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/clyde-williams-080---water-hygiene-compliance---10---12-june-26.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/clyde-williams-080---water-hygiene-compliance---10---12-june-26.html</guid>
<pubDate>Wed, 10 Jun 2026 11:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[CAP Site - Crane Erection (TC 2) - 17th June 2026

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>The erection of the second tower crane for the CAP site will take place on<em> </em>Wednesday 17<sup>th</sup> June. The 120 tonne mobile crane will arrive at 7am and the escort vehicle will take it to the site. Several articulated lorries will travel from Holywell car park to the site during the day to erect the crane. All works should be completed by 6pm on Wednesday. Whilst the articulated lorries are driving through site there may be traffic delays along university road this will only be temporary and traffic should run normally most of the day.</p>
<h3>Timescale</h3>
<p>Wednesday&nbsp; 17<sup>th</sup> June 7-am to 6-pm</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: - David Bell project Manager</p>
<p>Mobile: - 07729080152</p>
<p>Email: - d.w.bell@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/cap-site---crane-erection-tc-2---17th-june-2026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/cap-site---crane-erection-tc-2---17th-june-2026.html</guid>
<pubDate>Wed, 10 Jun 2026 10:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Michael Pearson East (078) / NCCAT Labs (225) - Fire Door Inspection - 08/06/26-30/07/26.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>The work needs to be done to ensure fire safety compliance within University buildings.</p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases.&nbsp; The disruption is expected to be minimal.&nbsp; The Contractor has been asked to report to Receptions where applicable, prior to carrying out the inspections in each building.</p>
<p>Michael Pearson East (078)</p>
<p>NCCAT Labs (225)</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>From 8/6/26 to 30/7/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p>Mobile:&nbsp; 07729080155</p>
<p>Email:&nbsp; R.M.Harrison@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/michael-pearson-e-078nccat-225---fire-door-inspection---080626-300726.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/michael-pearson-e-078nccat-225---fire-door-inspection---080626-300726.html</guid>
<pubDate>Wed, 10 Jun 2026 09:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Edward Barnsley Cope Auditorium (043) - Asbestos Survey - 12/06/2026.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Contractor - Lucion will attend on the 12<sup>th</sup> June to complete asbestos surveys in the Cope auditorium.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>12/06/2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Rod Harrison - Helen Sloss- project manager</p>
<p>Mobile: &nbsp;07773053852</p>
<p>Email: &nbsp;<a href="mailto:H.Sloss@lboro.ac.uk">H.Sloss@lboro.ac.uk</a></p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/edward-barnsley-cope-auditorium-043---asbestos-survey---12062026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/edward-barnsley-cope-auditorium-043---asbestos-survey---12062026.html</guid>
<pubDate>Wed, 10 Jun 2026 09:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Campus Living Offices (119) - Heating Plant Replacement (Phase 2) - 15th June for 3 weeks.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>SAC Heating Plant Replacement (Phase 2)</p>
<p>The new heating plant installed to the basement store area within a new caged area is set to resume which will pertain the connection of the district heating pipework, connection of the power supplies, BMS control installation to the newly installed plant equipment followed by commissioning.</p>
<p>The majority of the work will be within the basement area however on occasions a contractor presence is expected to the occupational health corridors to access and install new power supplies to the electrical distribution boards.</p>
<p>New wireless field control devices are to be installed to the Occupational Health Open Plan Office, SAC Reception, SAC Open Plan Office, Health &amp; Safety Office, these devices will monitor the heating within the space and will link to the LoRaWAN hub at the central boiler house. A minor short disturbance is to be expected in each space while the new sensor is fixed to the wall.</p>
<p>Noise is to be expected where drilling of the structure is required to fix brackets for new components as well as formation of new holes through for new power supply routing from above floor level to the basement area.</p>
<p>During commissioning the heating system will need to be tested to prove correct operation and control, during this time offices could feel hot due to the summer external temperatures, this should last no more than 1 day and is expected to take place towards the end of the 3<sup>rd</sup> week (1<sup>st</sup> &ndash; 3<sup>rd</sup> July).</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>W/C 15<sup>th</sup> June for 3 weeks.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Aaron Smart, Mechanical Building Services Engineer&nbsp;</p>
<p>Mobile: &nbsp;07989420705&nbsp;</p>
<p>Email: &nbsp;a.j.smart@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/campus-living-119---heating-plant-replacement-phase-2---15th-june-for-3-weeks.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/campus-living-119---heating-plant-replacement-phase-2---15th-june-for-3-weeks.html</guid>
<pubDate>Tue, 09 Jun 2026 14:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Butler Court (exterior) - Water Meter Replacement - 08/07/2026.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Water meter replacement for the meter serving Butler Court accommodation. The meter is located on roadway, corner of Towers way, Outside Netball Badminton &amp; Butler Court</p>
<p>During the meter replacement the water will be isolated to the Butler Court accommodation for between 2-3 hours.</p>
<p>Due to the location of the meter vehicle access may be restricted for a short period, signage and barriers will be in place, but please take care in the area.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>Thursday 08<sup>th</sup> July 2026, After 9am (exact time will be confirmed with occupants closer to the time) works durations approx. 4 hours in total, water isolation between 2-3 hours during this time.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name:&nbsp;Jenny Sawbridge, - Energy Technician&nbsp;</p>
<p>Mobile: &nbsp;01509 228066&nbsp;</p>
<p>Email: &nbsp;J.A.Sawbridge:@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/butler-court-exterior---water-meter-replacement---08072026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/butler-court-exterior---water-meter-replacement---08072026.html</guid>
<pubDate>Mon, 08 Jun 2026 14:40:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Towers East (540) &amp; West (541) - Electrical Testing &amp; Small Works - 15/6/26-24/9/26.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Electrical Testing of all electrical circuits within the building. Over the duration of the works all circuits will be turned off 1 at a time to carry out tests, each circuit will be off for no more than 20 minutes per circuit. This will mean lighting and power supplies will be affected for short durations of time.&nbsp; Full testing and inspection of the electrical installation is required to comply with The Electricity at Work Regulations 1989.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>15/06/2026 - 24/09/2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Michael Wraight, Electrical Contracts Supervisor</p>
<p>Mobile: &nbsp;07895 331913</p>
<p>Email: &nbsp;m.wraight@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/towers-east-540--west-541---electric-testingsmall-works---15626-24926.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/towers-east-540--west-541---electric-testingsmall-works---15626-24926.html</guid>
<pubDate>Mon, 08 Jun 2026 14:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Rutherford (Multiple Buildings) - Electrical Testing &amp; Small Works - 15/6/26-24/9/26.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Electrical Testing of all electrical circuits within the building. Over the duration of the works all circuits will be turned off 1 at a time to carry out tests, each circuit will be off for no more than 20 minutes per circuit. This will mean lighting and power supplies will be affected for short durations of time.&nbsp; Full testing and inspection of the electrical installation is required to comply with The Electricity at Work Regulations 1989.</p>
<p>(486)&nbsp; &nbsp; &nbsp;Rutherford&nbsp; 21</p>
<p>(487)&nbsp; &nbsp; &nbsp;Rutherford 18</p>
<p>(488)&nbsp; &nbsp; &nbsp;Rutherford 19</p>
<p>(489)&nbsp; &nbsp; &nbsp;Rutherford 20</p>
<p>(494)&nbsp; &nbsp; &nbsp;Rutherford 1</p>
<p>(495)&nbsp; &nbsp; &nbsp;Rutherford 2</p>
<p>(496)&nbsp; &nbsp; &nbsp;Rutherford 3</p>
<p>(497)&nbsp; &nbsp; &nbsp;Rutherford 4</p>
<p>(498)&nbsp; &nbsp; &nbsp;Rutherford 5</p>
<p>(499)&nbsp; &nbsp; &nbsp;Rutherford 6</p>
<p>(500)&nbsp; &nbsp; &nbsp;Rutherford 7</p>
<p>(501)&nbsp; &nbsp; &nbsp;Rutherford 15</p>
<p>(502)&nbsp; &nbsp; &nbsp;Rutherford 16</p>
<p>(503)&nbsp; &nbsp; &nbsp;Rutherford 10 (Sub Warden)</p>
<p>(504)&nbsp; &nbsp; &nbsp;Rutherford 11</p>
<p>(505)&nbsp; &nbsp; &nbsp;Rutherford 8/9 (Laundry)</p>
<p>(506)&nbsp; &nbsp; &nbsp;Rutherford Lodge (Warden)</p>
<p>(520)&nbsp; &nbsp; &nbsp;Rutherford 17</p>
<p>(521)&nbsp; &nbsp; &nbsp;Rutherford 14</p>
<p>(522)&nbsp; &nbsp; &nbsp;Rutherford 13</p>
<p>(523)&nbsp; &nbsp; &nbsp; &nbsp;Rutherford 12</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>15/06/2026 - 24/09/2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Michael Wraight, Electrical Contracts Supervisor</p>
<p>Mobile: &nbsp;07895 331913</p>
<p>Email: &nbsp;m.wraight@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/rutherford-multi-buildings---electric-testingsmall-works---15626-24926.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/rutherford-multi-buildings---electric-testingsmall-works---15626-24926.html</guid>
<pubDate>Mon, 08 Jun 2026 14:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Faraday/Royce Dinning (467) - Electrical Testing &amp; Small Works - 15/6/26-24/9/26.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Electrical Testing of all electrical circuits within the building. Over the duration of the works all circuits will be turned off 1 at a time to carry out tests, each circuit will be off for no more than 20 minutes per circuit. This will mean lighting and power supplies will be affected for short durations of time.&nbsp; Full testing and inspection of the electrical installation is required to comply with The Electricity at Work Regulations 1989.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>15/06/2026 - 24/09/2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Michael Wraight, Electrical Contracts Supervisor</p>
<p>Mobile: &nbsp;07895 331913</p>
<p>Email: &nbsp;m.wraight@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/faradayroyce-dinning---electric-testingsmall-works---15626-24926.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/faradayroyce-dinning---electric-testingsmall-works---15626-24926.html</guid>
<pubDate>Mon, 08 Jun 2026 14:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[David Collett Dining  (539) - Electrical Testing &amp; Small Works - 15/6/26-24/9/26.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Electrical Testing of all electrical circuits within the building. Over the duration of the works all circuits will be turned off 1 at a time to carry out tests, each circuit will be off for no more than 20 minutes per circuit. This will mean lighting and power supplies will be affected for short durations of time.&nbsp; Full testing and inspection of the electrical installation is required to comply with The Electricity at Work Regulations 1989.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>15/06/2026 - 24/09/2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Michael Wraight, Electrical Contracts Supervisor</p>
<p>Mobile: &nbsp;07895 331913</p>
<p>Email: &nbsp;m.wraight@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/david-collett-dining---electric-testingsmall-works---15626-24926.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/david-collett-dining---electric-testingsmall-works---15626-24926.html</guid>
<pubDate>Mon, 08 Jun 2026 14:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[SportPark (081) - Flexible Rubber Hose Compliance Rectifications - 15th &amp; 19th June 2026.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Minor plumbing alterations at sinks and wash hand basins to remove flexible rubber hoses.</p>
<p>The sink or basin will be offline for 30 minutes to 2 hours at a time while the work is taking place.&nbsp;</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>15th &amp; 19th June 2026.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Nikki Kilday &ndash; Water Hygiene</p>
<p>Mobile: &nbsp;07394835656</p>
<p>Email: &nbsp;N.Kilday@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/sportpark-081---flexible-rubbe-hose-compliance-rectifications---15-19-june-26.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/sportpark-081---flexible-rubbe-hose-compliance-rectifications---15-19-june-26.html</guid>
<pubDate>Mon, 08 Jun 2026 14:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[John Pickford Building (033) - Ceiling Repairs - 11th June 2026.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Please note that the university is arranging repairs to the damaged ceiling area within the cleaners' cupboard (Room HH006 next to entrance foyer).</p>
<p>As a prerequisite to these works, the University has appointed Lucion Services Ltd to undertake an intrusive R&amp;D asbestos survey of the ceiling and its immediate surrounding areas within the cupboard.</p>
<p>I would be grateful for your co-operation in facilitating this important survey.</p>
<p>Please follow any instructions provided by the asbestos technician while the survey is being carried out.</p>
<p>The survey is currently scheduled to take place on 11th June 2026, and the work itself is expected to take no longer than one hour to complete.</p>
<p>Thank you in advance for your assistance and co-operation.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>11th June 2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Aaron Smart &ndash;&nbsp;Spencer Aryeetey, Building Fabric Surveyor</p>
<p>Mobile: &nbsp;07977 004475</p>
<p>Email: &nbsp;s.aryeetey@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/john-pickford-building-033---ceiling-repairs---11th-june-2026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/john-pickford-building-033---ceiling-repairs---11th-june-2026.html</guid>
<pubDate>Mon, 08 Jun 2026 10:50:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Stewart Miller (Aeronautical) Building (066) - Parking Bay closure - 12th June 2026. 

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Parking spaces at  adjacent to Cotoneaster hedging will be closed off to allow for hedge cutting &amp; shrub pruning.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>6am-10am - 12th June 2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Aaron Smart &ndash; Richard Fenn Griffin</p>
<p>Mobile: &nbsp;07891950575</p>
<p>Email: &nbsp;r.s.fenn-griffin@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/stewart-miller-building---parking-bay-closure---12th-june-2026-.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/stewart-miller-building---parking-bay-closure---12th-june-2026-.html</guid>
<pubDate>Mon, 08 Jun 2026 10:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Charnwood Building (055) - Access Restrictions  - 12th June 2026. 

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Access restrictions at east side of Charnwood Building </p>
<p>Access around this area will be restricted to one lane controlled by the gardens team.&nbsp; Access is unimpeded going the long way round the building.&nbsp;&nbsp;</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>12:30-14:30&nbsp; - 12th June 2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Aaron Smart &ndash; Richard Fenn Griffin</p>
<p>Mobile: &nbsp;07891950575</p>
<p>Email: &nbsp;r.s.fenn-griffin@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/charnwood-building---access-restrictions----12th-june-2026-.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/charnwood-building---access-restrictions----12th-june-2026-.html</guid>
<pubDate>Mon, 08 Jun 2026 10:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Falkner Games Room (642) - Gas Entry Replacement - 5th-12th/06/2026.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>The gas service isolation valve at Falkner Games Room has been reported as faulty and not providing adequate isolation to building plant. The external gas building entry into the meter cupboard will be replaced, a new meter inlet valve will be installed, an additional SIV will also be installed to the buried gas service to provide an additional isolation point to the building.</p>
<p>Excavation to expose the existing buried gas pipework will be required to allow the service to be squeezed off for safe working operation.</p>
<p>The gas service to be worked on only affects the Falkner games room heating which is currently offline for summer - there will be no disruption to accommodation blocks.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>Friday 5<sup>th</sup> June to Friday 12<sup>th</sup> June 2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Aaron Smart &ndash; Mechanical Building Services Engineer</p>
<p>Mobile: &nbsp;07989420705</p>
<p>Email: &nbsp;<a href="mailto:a.j.smart@lboro.ac.uk">a.j.smart@lboro.ac.uk</a></p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/falkner-games-room---gas-entry-replacement---5th-12th062026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/falkner-games-room---gas-entry-replacement---5th-12th062026.html</guid>
<pubDate>Fri, 05 Jun 2026 11:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[David Collett blocks A, B, C (533, 534, 535) - Flexible Rubber Hose Compliance Rectifications - 27th-31st July 2026.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Plumbing alterations to wash hand basins in each bedroom to remove none compliance flexible hoses and refit with copper.</p>
<p><strong>&nbsp;The hot and cold water will be offline for the week, and water drained while the work takes place.</strong></p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>27/07/26 to 31/07/26</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Nikki Kilday &ndash; Water Hygiene</p>
<p>Mobile: &nbsp;07394835656</p>
<p>Email: &nbsp;N.Kilday@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/david-collett-blocks-a-b-c---rubber-hose-rectifications---27-31-july-26.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/david-collett-blocks-a-b-c---rubber-hose-rectifications---27-31-july-26.html</guid>
<pubDate>Fri, 05 Jun 2026 10:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Charnwood (055) &amp; Garendon (056) - Gas Supply Maintenance - 22nd-26th June 2026.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Charnwood Core D Gas Supply Maintenance.</p>
<p>Deterioration of the underground gas supply pipework has been identified to the Charnwood &amp; Garendon gas supply at the NCCAT meter house. This pipework serves the gas supply that enters the building at Core D feeding all areas of Charnwood &amp; Garendon.</p>
<p>The deteriorated section is to be replaced with new PE sections of pipework and gas industry WASK above ground transition fittings.</p>
<p>All gas appliances will need to be switched off and isolated prior to work commencing to ensure the gas pressure within the building is maintained. William Freer will carry out the isolation works on Monday 22<sup>nd</sup> June.</p>
<p>Our GIRS contractor Ashfield Gas will start the operation on Monday 22<sup>nd</sup> June following confirmation of appliance isolations, this will involve squeezing off the PE main at the meter house and installing the new pipe sections. This work is anticipated to take 5 days including post work checks and tests.</p>
<p>There will be no gas to Charnwood &amp; Garendon building from Monday 22<sup>nd</sup> June through to Friday 26<sup>th</sup> June 2026. The lack of gas will result in the high bay Ambi-rad heating &amp; Caf&eacute; hot water system being offline for the duration. We have aligned this work to be carried out during the planned Caf&eacute; refurbishment closure to avoid multiple disruptions.</p>
<p>Tenants are to disseminate the period of no gas to their teams and ensure process gas appliances are not operated during the repair works operation.</p>
<p>(Please note that the gas supply to the Holywell energy centre will still be online and live as it is connected via its own dedicated services, so MTHW heating &amp; indirect hot water will not be affected by the works).&nbsp;</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>22/06/26 &ndash; 26/06/26</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name: Aaron Smart &ndash; Mechanical Building Services Engineer</p>
<p>Mobile: &nbsp;07989420705</p>
<p>Email: &nbsp;a.j.smart@lboro.ac.uk&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/charnwood--garendon---gas-supply-maintenance---22-26-june-26.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/charnwood--garendon---gas-supply-maintenance---22-26-june-26.html</guid>
<pubDate>Fri, 05 Jun 2026 09:30:00 GMT</pubDate>
</item>





